Islands Mechanical Contractor (IMC), Inc. is experienced with government contracts. We know the procedures for assembling and submitting the required documentation as well as progress documentation. Our experience allows us to navigate each project through the proper channels, ensuring greater efficiency and minimized delays. We have successfully completed numerous projects for the U.S. Army, the U.S. Marine Corps and the U.S. Navy.


Project:
Renovations to Administration Building H-3
Location: Naval Station Guantanamo Bay, Cuba
Project Value: $593,697
Contact: Lt Jonathan Higdon (DSN) 660-4305 or 011-5399-4305
Duration: October 2006 to September 2007

This Fixed-Price project included both interior and exterior modifications to an existing building. The building serves as an administration and support facility to the main hospital on U.S. Naval Station on Guantanamo Bay, Cuba. Trade work included exterior walls, HVAC, interior partitions, electrical with a stand-by generator, fire alarm and sprinkler systems.

 


Project:
Repair Fuel Facility Building 899
Location: Naval Station Guantanamo Bay, Cuba
Project Value: $486,487
Contact: Paula Claudio (DSN) 660-4162 or 011-5399-4162
Duration: October 2006 to October 2007

This Design/Build project included the replacement of the building and structures from around the existing fuel pumps that transferred all the required fuel for the entire naval base. Special care was required to mobilize or demobilize from the project within an hour’s notice, so that the base could utilize their equipment to transfer fuel off ships or to refuel ships. Special safety procedures were required to allow the existing electrical to be relocated and supported, while the new structure was being installed.

 


Project:
Design/Build of the Community Center Renovations
Location: Naval Station Guantanamo Bay, Cuba
Project Value: $107,407
Contact: Paula Claudio (DSN) 660-4162 or 011-5399-4162
Duration: October 2008 to August 2009

This Design/Build project was a complete screened enclosure addition to the existing community center. The design was a low-maintenance addition that provided additional building space for guests to enjoy the evening temperatures without being bothered by bugs.

 


Project:
Design/Build Migrant Operations Facility
Location: Naval Station Guantanamo Bay, Cuba
Project Value: $16,705,707
Contact: Paula Claudio 011-5399-4011 Ext 4162
Duration: May 2007 to June 2008

IMC completed this Design/Build project in just over one year. The project built a staging facility that will be used in the event of mass migration. The facility consisted of 38 buildings with more than 100,000 square feet of building space. We developed the utilities and infrastructure to support the possible 30,000 migrants, in addition to the buildings. The scope required a 300,000 gallon per day waste water treatment facility that has the capacity to produce 30,000 gallons per day of gray water.

 


Project:
Renovations to Building 1660 Phase 1 & 2
Location: Naval Station Guantanamo Bay, Cuba
Project Value: $13,077,584
Contact: Paula Claudio 011-5399-4011 Ext 4162
Duration: October 2005 to June 2008

IMC was awarded Phase 1 of this multi-story building. We completely renovated from the structure out. We replaced the plumbing, HVAC, electrical, doors, roof, windows, and designed and installed a new life safety fire alarm and sprinkler system. The project was completed with such success the contract was modified to include Phase 2.

 


Project:
Security Upgrades Exterior Facilities
Location: Naval Station Guantanamo Bay, Cuba
Project Value: $2,475,112
Contact: MacKenny Hartman
Duration: June 2003 to August 2004

This Design/Build project required lighting the perimeter fence line surrounding the base. The design team evaluated the existing electrical demands and calculated the future demands on the electrical grid for the entire base. The lighting project required the resizing of some of the existing high voltage distribution system back to the power generation station. The project also included the installation of more than 8,000 lineal feet of security fencing.

 


Project:
Enlisted Mens Club - Windjammer
Location: Naval Station Guantanamo Bay, Cuba
Project Value: $1,496,714
Contact: Paula Claudio 011-5399-4011 Ext 4162
Duration: September 2008 to Spring 2010

This Design/Build project replaced the air conditioning system within the main gathering facility on base in Guantanamo Bay. It includes a high efficiency air-cooled chiller, new air handling units and 100% outside air units. The system will be equipped with a new computer system to control space, temperature and humidity. The project is challenging because of required scheduled outages on the facility.

 


Project:
Repairs and Modifications to Building AV624
Location: Naval Station Guantanamo Bay, Cuba
Project Value: $2,287,767
Contact: Paula Claudio 011-5399-4011 Ext 4162
Duration: February 2008 to March 2009

This Design/Build project converted an existing two-story building into housing. The existing building was stripped down to the structure and rebuilt to include metal stud walls, plumbing, air conditioning, roofing, windows, doors, life safety fire alarm and sprinkler systems.